Platform

What does the Assure workspace do in Acuna GRC?

Direct answer

Assure is the Acuna GRC workspace where you prove the management system works. It keeps the records that show a control ran, audits planned in programs with a period that groups their records, issues such as nonconformities and incidents, and corrective actions that keep implementation apart from verification.

It also keeps the numbers: KPIs with targets, their measurements over time, a shared dashboard, and reports exported as PDF or Excel. With the Evaluations add-on, exceptions record gaps you accept on purpose, with a required end date. Everything links back to requirements, measures and controls, so an auditor can follow the trail from requirement to proof.

What does proving a management system works involve?

The last part of every management system standard is about evidence. ISO/IEC 27001:2022 asks you to monitor, measure, analyse and evaluate (clause 9.1), to run internal audits at planned intervals with an audit programme (clause 9.2), to hold management reviews (clause 9.3), and to react to nonconformities with corrective action and keep the results (clause 10.2). NIS2 asks for policies and procedures to assess the effectiveness of cybersecurity risk-management measures (Article 21(2)(f)).

What these have in common is that someone outside the work, an auditor, a regulator or the management body, must be able to check it. That takes records with dates, audits with findings, findings with actions, and figures that can be traced back to the items behind them.

How do records, audits, issues and corrective actions fit together?

  • Records are the proof that something was done, unchanged once made. Most are created when a task or a control execution is completed, and a checklist run files its own. See how evidence lifecycle works.
  • Audits are planned in programs, each a planning cycle with a frequency and dates. An audit has a type (Internal, External or Certification), a lead auditor, an auditee and a conclusion, and its period groups linked records as In period, Undated and Other periods.
  • Issues hold nonconformities, observations and weaknesses with a status, a source, an owner and attachments. An Incident or Near-miss issue gets a timeline of dated steps.
  • Corrective actions carry the remedy and a root cause analysis, and move through Open, In Progress, Implemented, Verified and Closed, which keeps implementation apart from verification. Owners are reminded when an action is due within three days or overdue.

With the Evaluations add-on, exceptions record a gap you accept on purpose: a justification, the linked requirement, control, issue or asset, a required Valid until date and an approver. Approved dates are locked, and both parties are warned before expiry.

How do KPIs and reports show performance?

The Assure dashboard is a shared grid of KPI widgets, each with its value, target and on-target state. KPIs take their values from manual entry, live Acuna GRC data, a connector, an external API or a group rollup, and formula KPIs combine others. See KPI data sources.

Reports are generated from templates with an optional period, scopes and tags. A section shows one of your KPIs, so the report and the dashboard agree, or lists the items that match a filter. Reports export as PDF or Excel, and each generation is kept as a snapshot you can reload later, which is useful for the management review and for showing what was reported at the time.

Who works in Assure?

Auditors and management read records, audit results, issues, KPIs and reports. Control owners and task assignees create most of the records through their daily work in Operate and Implement. Issue and corrective action owners work their own registers, and approvers decide exceptions.

The Trust Center pages (RFPs and questionnaires, the answers library, the exposure library and access requests) also sit in the Assure sidebar as their own module. For a head office, Group Compliance counts each organisation’s active, expiring and expired exceptions. See how Acuna GRC shows audit readiness and the Assure workspace.

How Acuna GRC handles it

Sources

  1. ISO/IEC 27001:2022, clauses 9.1, 9.2, 9.3 and 10.2
  2. Directive (EU) 2022/2555 (NIS2), Article 21(2)(f)
  3. Acuna GRC, Assure workspace

This page explains the rules in general terms and is not legal advice.

Frequently asked

Is an exception the same as marking a requirement Not applicable?

No. Not applicable means the requirement does not concern you, with a justification. An exception accepts a gap in a requirement that does apply, for a limited time, with an approver and a required end date.

Can a report be reproduced later as it was?

Yes. Each report generation is saved as a snapshot that you can reload later, alongside the PDF or Excel export.

See how Acuna GRC runs this.

Tell us your frameworks and your team. We show you how Acuna GRC runs the program.

Hosted in Switzerland, the EU or the US